About this project
Our Major Patching program is developed annually to repair small-medium localised pavement failures across our sealed road network. These works are sometimes conducted one to two years in advance to prepare roads for routine resurfacing works or as identified to address isolated defects. Our Sealed Pavement Rehabilitation Program targets roads that have sections with numerous failures and significant roughness and require full-width reconstructions.
Why was this project undertaken?
The ‘pavement’ of a sealed road refers to the various layers of crushed rock, gravels and natural material which exist under the black sealed surface. This sandwich of compacted materials provides the structural base of the road that supports the traffic while the thin bitumen surface acts as the waterproofing layer to prevent the pavement from getting excessively wet and falling apart.
Over a road's life, traffic slowly breaks down the pavement materials until they can no longer support the traffic loads, which causes them to deform and ultimately fail.
What is the impact of these works?
These works helped create safer driving conditions by addressing a number of defects and improving the road surface.
Roads included in the 2024/25 program
Road name
Status
Racecourse Road – Yackandandah
Complete
Indigo Creek Road - Indigo Valley
Complete
Twist Creek Road - Yackandandah
Complete
Back Creek Road – Yackandandah
Complete
Diffey Road - Beechworth
Complete
Wood Street - Beechworth
Complete
Gilchrist Avenue - Beechworth
Complete
Warner Road - Beechworth
Complete
Gooramadda Road - Gooramadda
Complete (additional works planned)
Up River Road - Gooramadda
Complete (additional works planned)
Barkley Street - Rutherglen
Complete
About this project
Our Major Patching program is developed annually to repair small-medium localised pavement failures across our sealed road network. These works are sometimes conducted one to two years in advance to prepare roads for routine resurfacing works or as identified to address isolated defects. Our Sealed Pavement Rehabilitation Program targets roads that have sections with numerous failures and significant roughness and require full-width reconstructions.
Why was this project undertaken?
The ‘pavement’ of a sealed road refers to the various layers of crushed rock, gravels and natural material which exist under the black sealed surface. This sandwich of compacted materials provides the structural base of the road that supports the traffic while the thin bitumen surface acts as the waterproofing layer to prevent the pavement from getting excessively wet and falling apart.
Over a road's life, traffic slowly breaks down the pavement materials until they can no longer support the traffic loads, which causes them to deform and ultimately fail.
What is the impact of these works?
These works helped create safer driving conditions by addressing a number of defects and improving the road surface.
Roads included in the 2024/25 program
Road name
Status
Racecourse Road – Yackandandah
Complete
Indigo Creek Road - Indigo Valley
Complete
Twist Creek Road - Yackandandah
Complete
Back Creek Road – Yackandandah
Complete
Diffey Road - Beechworth
Complete
Wood Street - Beechworth
Complete
Gilchrist Avenue - Beechworth
Complete
Warner Road - Beechworth
Complete
Gooramadda Road - Gooramadda
Complete (additional works planned)
Up River Road - Gooramadda
Complete (additional works planned)
Barkley Street - Rutherglen
Complete
Page last updated: 25 Nov 2024, 01:25 PM
Lifecycle
Design
Sealed Pavement Major Patching program has finished this stage
Tender
Sealed Pavement Major Patching program has finished this stage
Works commence
Sealed Pavement Major Patching program has finished this stage
Scheduled for spring 2024
Works complete
Sealed Pavement Major Patching program is currently at this stage