O'Neill Lane Bridge Repairs

Share O'Neill Lane Bridge Repairs on Facebook Share O'Neill Lane Bridge Repairs on X (formerly Twitter) Share O'Neill Lane Bridge Repairs on Linkedin Email O'Neill Lane Bridge Repairs link

About this project

As part of our minor bridge renewal program, we are upgrading O'Neill Lane Bridge over Sandy Creek, located approximately 250 metres from the intersection with Sandy Creek Road. These types of works are generally identified through routine inspections and are typically more complex than routine maintenance, requiring specialist advice and contractors. They are necessary to help ensure the ongoing structural integrity of the bridge into the future.

What is happening and when?

The package of works includes addressing damage to the bridge barriers, along with a series of repairs and improvements to the underlying substructure and erosion protection within the waterway. The scope also includes further inspections and testing to inform Council engineers of the bridge's condition and ongoing capacity. Council has awarded a contract to complete the specified works and expects to mobilise to site later in November. Works are expected to take around two weeks to complete once on site.

What about access?

We acknowledge that this bridge provides the sole access for most properties along O'Neill Lane and will ensure it remains accessible for residents throughout the project, while keeping traffic disruption to a minimum. However, minor delays may be experienced while works are being completed at deck level, and one particular task is expected to require a short closure of around one hour. Importantly, the nature of the works means emergency access could be restored very quickly if required.

About this project

As part of our minor bridge renewal program, we are upgrading O'Neill Lane Bridge over Sandy Creek, located approximately 250 metres from the intersection with Sandy Creek Road. These types of works are generally identified through routine inspections and are typically more complex than routine maintenance, requiring specialist advice and contractors. They are necessary to help ensure the ongoing structural integrity of the bridge into the future.

What is happening and when?

The package of works includes addressing damage to the bridge barriers, along with a series of repairs and improvements to the underlying substructure and erosion protection within the waterway. The scope also includes further inspections and testing to inform Council engineers of the bridge's condition and ongoing capacity. Council has awarded a contract to complete the specified works and expects to mobilise to site later in November. Works are expected to take around two weeks to complete once on site.

What about access?

We acknowledge that this bridge provides the sole access for most properties along O'Neill Lane and will ensure it remains accessible for residents throughout the project, while keeping traffic disruption to a minimum. However, minor delays may be experienced while works are being completed at deck level, and one particular task is expected to require a short closure of around one hour. Importantly, the nature of the works means emergency access could be restored very quickly if required.